● CLEANROOM BAY 04 · ISO CLASS 5 · LINK STABLE
Safiya builds chips that tape out clean.
ASIC physical design engineer — floorplan to GDSII on 7nm and 5nm FinFET. Six production tape-outs, zero respins from layout. This is her control room: press the button and watch a sign-off run close.
01 / SIGN-OFF
Live tape-out verification
A replay of ATLAS-7's final sign-off week, compressed to forty seconds. DRC, LVS, antenna and timing all have to reach zero before the GDSII leaves the building.
safiya@pd-farm-04:~/atlas7$ ▌
02 / CORNERS
PVT corner matrix
Every chip has to work at every combination of process skew, supply voltage and junction temperature. Pick a cell to see its numbers, then push the knobs yourself.
meets target under 5% margin violates — needs fix
delay ∝ V / (V − Vth)α · α = 1.3 · Pdyn = a·C·V²·f · leakage doubles every ~22 °C
03 / FLOW
RTL to GDSII, stage by stage
Safiya's FinFET implementation flow. Click any stage to open what happens there, which tool runs it and the numbers she watches. Press “Trace” to send a netlist through the whole hierarchy.
sequenceDiagram
participant PT as PrimeTime STA
participant S as Safiya
participant INV as Innovus
participant CAL as Calibre
PT->>S: 37 setup violators at SSG 0.675V -40C
S->>S: Sort by path group, pick sizing vs. buffering
S->>INV: ecoChangeCell + ecoAddRepeater (TCL)
INV->>INV: ECO route, 0.3% wire change
INV->>CAL: Stream out GDS + LEF/DEF
CAL-->>S: DRC 0, LVS clean
S->>PT: Re-run with StarRC SPEF
PT-->>S: WNS +4.1 ps, all corners met04 / SANDBOX
Place the macros yourself
A 1.2 × 1.2 mm block with six SRAM macros and an I/O ring. Drag macros to shorten wires and clear congestion. Keep-out halos must not overlap, and the hotspot grid updates as you move.
05 / TOOLBENCH
EDA tools and benchmarks
Runtimes from her own runs on ATLAS-7 (38M instances, 64-core farm nodes). The table is her daily kit; the charts show where the hours go.
06 / MISSION LOG
Tape-outs on record
07 / HANDOFF
Have a block that won't close timing?
Safiya takes on physical design roles and short sign-off rescues: floorplan reviews, congestion fixes, CTS tuning and the last mile of DRC. Send a note with your node and target date.